T: 0845 6585301 E: info@oclonline.co.uk

Case Studies

  • Sheffield Recycling Facility

    OCL have been successful in winning a long-term supply agreement for the provision of recycling facility management and waste recycling services to the Sheffield City PFI scheme. We operate a bespoke 4 acre recycling centre in the city and manage all waste arisings from the PFI contract to reconstruct and maintain the cities road network. […]

    View Case Study in Detail
  • A13 Sadlers Farm Junction Improvements

    Client: Birse Civils Aim: To produce a class 2 foundation layer in FABM (Fly Ash Bound Material) at high outputs on this high profile, programme constrained project. Description: OCL were involved with the clients designers, Mouchel, to assist in the mix design for a FABM foundation material for a new- build Highways Authority strategically important […]

    View Case Study in Detail
  • 2012 Olympics Infrastructure – Stratford, London

    Clients: Aggregate Industries, Spadeoak and Toppesfield. Aim: To maximise the use of sustainable, low carbon materials in this high profile project. Description: OCL’s Foambase™ material was approved and adopted as a more sustainable alternative to traditional asphalt. Over a period of 2 years of construction the material was batched at our Dagenham (East London) depot […]

    View Case Study in Detail
  • Thanet Bio Fuel Facility, fuel storage clamps.

    Client: O’Rourke Contracting Description: OCL moved the Wirtgen KMA 220 ex-situ mixer to site in Thanet, Kent.  3000t of Foambase™ was provided as a value engineered alternative to traditional Base material. The client gets the program benefit of surety of supply and high outputs compared to traditional asphalt plants. The mixer is on site so […]

    View Case Study in Detail
  • Luton Airport – Long Term Car Park

    Aim: To maximise value generation and reuse of airport derived construction and demolition waste in the construction of the car park. Client: Ryebridge Construction and Focus Paving. Description: OCL were engaged to provide the surfacing materials and recycling services for the construction of the new extension to the Long Term Car Park. Through early contractor […]

    View Case Study in Detail